Drove down to Salida, CO on Saturday night to catch FIBArk, one of the largest whitewater festivals in the world:
In-floor heating installed on the east half of the duplex:
The PEX tubing is laid out on the re-mesh frame (it's tied in using copper rebar ties). Hot water (125 degrees or so) circulates through five different circuits that feed into a manifold located in the laundry room:
The future site of the manifold:
Thinking through drawing: working through the framing details that we will be faced with in the next couple of weeks.
Sketching possibilities for a rammed earth wall section:
No comments:
Post a Comment